The dirt from the excavation has now been spread out over the yard, several more truck loads of dirt will be brought in to even out the terrain:
The stairwell to the crawl space in the attic has been demolished. This wall will eventually taken down and the stairwell to the basement will be nailed up and the kitchen will be extended into this area: